Send the same drawing to three die casters and the quotes can differ by a factor of two. Visit all three and each will say the equipment is complete, the certificates are in place and similar parts have been made before. What actually separates them is not in those statements but in a handful of questions that can be verified.
The checklist below covers four items in each of three layers and can be printed and taken onto the shop floor. It is not a scorecard; it translates a general impression into questions you can ask and evidence you can see.
Whether a supplier can make the part is a capability question. Whether it makes it the same way every batch is a systems question. Whether day-to-day work is smooth is a working-relationship question. Miss any one and the problem appears at production in a different form: capability means it cannot be made at all, systems means the first article passes and production drifts, relationship means the delivery date keeps moving.
Most evaluations only test the first layer, because an equipment list is the easiest thing to present. The problems that actually hurt at ramp-up usually come from the other two.
Bigger is not better. Running a small part on an oversized machine is uneconomic in die heating and cycle time; too small a machine cannot hold the projected area and produces flash and incomplete fill. Ask which machine the part will run on and why. A supplier who has calculated it will answer immediately.
This determines how fast a change can happen. A supplier that builds its own dies may turn a geometry change around in days; one that subcontracts first has to queue at the toolmaker, and two to three weeks is normal. If your design is still iterating, this matters more than price.
Casting is only the first step. Deburring, machining, surface finishing, assembly and packing, if all in house, mean one owner for lead time and quality. If they are split across subcontractors, a problem in any one link leaves you mediating between parties. Ask what is in house, what is not, and who the subcontractors are.
The usual set is spectrometry for chemistry, X-ray or CT for internal soundness, CMM for dimensions, salt spray for corrosion and tensile testing for mechanical properties. Having the equipment and being able to interpret the results are two different things. When you look at a report, check whether it came from the supplier lab or a third party, and whether it carries a batch number and a pass or fail conclusion.
This is the item most easily glossed over. An IATF 16949 certificate names the products and processes in scope, and some cover only one workshop or one family of parts. If your part is cast and then machined, and the scope covers casting only, the machining operation sits outside the system.
The check is simple: ask for a copy, read the scope statement, and compare it line by line with your process route. If it does not match, ask. Do not settle for we are certified.
Pose a concrete scenario: a customer finds a dimensional deviation three months later. Can you identify which melt, which die, which machine, which shift and which process parameters produced that batch. A supplier who can answer has a record system; one who cannot has inspection without traceability.
The interesting question is not the defect rate but what follows a defect. Is there a quarantine area, a written rework acceptance standard, a recorded root cause and corrective action. A supplier that writes a proper 8D usually has a working internal process as well.
A high proportion of returns raises both chemistry variation and gas content. Ask what percentage of returns is permitted, how it is recorded, and how different alloys are kept apart. This is rarely asked and is the quietest source of batch-to-batch variation.
A sales contact and a process engineer are very different. The first relays questions and a technical point takes three days; the second answers on the spot. A small test: ask where the gate will be and why.
Settle in advance how many trials are included in the die price, how extra trials are charged, whether a design change is billable, and whether a fault in the die itself is corrected free. None of this comes up while things go well; all of it comes up when they do not.
Some plants only want volume, cannot schedule small orders, or quote a price designed to decline the work. If your project ramps from small batches, confirm the minimum order quantity and how ramp-up volumes are scheduled before you commit rather than afterwards.
A single total price is hard to compare and impossible to read. Ask for tooling, material, casting, machining, finishing, packing and freight separately. An itemised quote is also a transparency test: a supplier willing to break it down is usually willing to explain the cost logic.
Everything to everyone: a machine list from 50 to 1600 tonnes and experience in every sector. The useful follow-up is which part families dominated the last twelve months, not how many machines exist
Certified, but not for your process: the certificate is genuine, simply not applicable. Read the scope statement, not the logo
Cheap because it excludes finishing: as-cast delivery, with deburring, machining and coating billed separately. Normalise the scope before comparing the number
A short walk covers most of it:
| Look at | What it tells you |
|---|---|
| Work in progress | Segregated and labelled means the shop floor system is running; mixed piles mean the flow is unclear |
| Die storage | Numbered, logged for maintenance and sorted by status means tooling is managed |
| Nonconforming area | Separated, labelled, with a disposition recorded means the quality loop is closed |
| Inspection room | Equipment in use, calibration labels current, records from today means it is not a display |
| Returns area | Segregated by alloy means material control is understood |
| Packing and dispatch | Outgoing inspection records and traceability labels mean the last gate is guarded |
If you get one conversation, ask these:
Which machine will this part run on, and why
Is the tooling built in house, and how long does a geometry change take
Which operations are on site and which are subcontracted
What products and processes does your certificate scope cover
Can you trace batch, melt, die and shift parameters
How many trials are included, and how are extra ones charged
What does the quote include, and what does it exclude
Which three part families did you run most in the last year
The first four decide whether the part can be made, the middle two whether it will be consistent, and the last two whether the project will run smoothly.
We are willing to be checked against every item above. Capability is shown in the automotive castings and industrial castings sections, and process control is visible in the notes for parts such as the actuator housing and the pneumatic valve seat.
If you are comparing suppliers, send the drawing and we will quote on the same itemised basis so the numbers can be compared directly. How a casting cost breaks down is covered in where the money goes in a die casting; how to grade tolerances is in the die casting tolerance guide.